One page per pilot.
Prep doc inside. Deck for the partner.
Each pilot is its own folder under /pilots/<name>/ with two surfaces: an internal prep doc (what Marco + Malek read together) and a customer-facing deck (what we actually screen-share). Index sorts by status — active first, future last.
- One pilot, two surfaces. Each
/pilots/<partner>has an internal prep doc and a separate customer-facing deck at/pilots/<partner>/deck. Same content, different audiences and registers. - Active right now: Indelible (Kevin Brockland). Our first portfolio rollout — Zunou is already in their portfolio. Three sequenced use cases. Pre-flight bug list visible.
- Two queued (Beachhead 0 wave 2): North Base Media + Headline. Fire only if Indelible's signal is mixed or if we want a parallel SEA read.
- One planned (Beachhead 1): TAI Tokyo, late July / early August 2026, conditional on Indelible UC1 clearing its gate.
- Two future (Beachhead 2): AI Tinkerers Ginza + Venture Café Toranomon. Layered post-TAI.
Indelible Ventures · Portfolio rollout
Beachhead 0 Wave 1Kevin Brockland · indelible.vc · Kuala Lumpur · SEA
Zunou is already in their portfolio (per Tracxn). First confirmed external pilot — three sequenced use cases mapped from the meeting: portfolio knowledge hub → AI Salon Bangkok → FI Thailand alumni.
Next action: Clear iOS pre-flight blockers, build portfolio-pulse template, book follow-up meeting on his Android.
North Base Media
Beachhead 0/2 Wave 2TBD contact · northbasemedia.com · TBD
Beachhead 0 wave 2 — fires only if Indelible signal is mixed (≤60% activation in 14d) or if we want a parallel SEA-anchored read before opening TAI.
Next action: Identify warm-intro path. Confirm thesis fit. Defer until UC1 (Indelible) hits its gate.
Headline Ventures
Beachhead 0/2 Wave 2 (alt)TBD contact · headline.com · TBD
Alternative to North Base for the second Beachhead 0 wave. Larger fund, potentially faster portfolio coverage but lower per-founder trust density.
Next action: Hold until Indelible gate. North Base is the preferred wave 2 unless intro paths shift.
TAI · Tokyo AI
Beachhead 1 Beachhead 1Ilya Kulyatin (warm intro) · Tokyo · Japan
Tokyo community pilot launches end July / early August 2026. ~4,000-person WhatsApp group + monthly meetup. Spaces (Event-Spaces) is the natural surface; the muted-WhatsApp-triage wedge is the activation play.
Next action: Gate-conditional on Indelible UC1. Run Spaces flow QA in parallel with Beachhead 0.
AI Tinkerers Ginza
Beachhead 2 Beachhead 2TBD chapter lead · Ginza · Tokyo
First of the layered Beachhead 2 communities. Dense AI builder audience overlaps with TAI; recurring monthly meetup format ideal for Spaces.
Next action: Defer. Layer in after Beachhead 1 establishes operational pattern.
Venture Café Toranomon
Beachhead 2 Beachhead 2TBD chapter lead · Toranomon · Tokyo
Weekly Thursday Gathering format (50–200 attendees per event). High recurrence = high cumulative installs. Spaces-as-event-OS positioning lands cleanly here.
Next action: Defer. Layer in alongside AI Tinkerers post-Beachhead 1.
Two URLs per partner, two registers.
What Marco + Malek read together before the meeting. Honest, action-oriented, with file:line cross-refs into Foundation Tier-1 and Journeys.
- Research on the partner (CFA, fund firmography, sister portfolio)
- Pain points captured from the meeting (in their words)
- Pre-flight bug list — what blocks the pilot
- Next-meeting agenda + open questions
What we screen-share with the partner. Visual-first, less internal jargon, designed to be walked through in 15–20 minutes. Includes screenshot zones for live product captures.
- Hero framing: their pain in their words
- Three sequenced use cases — visual narrative
- Product-in-action screenshot zones
- What "success in 14 days" looks like — magic-number framed for them
- What we're asking from them next
- Drop a row in the array at the top of
/src/pages/pilots/index.astro - Create
/src/pages/pilots/<partner>.astrofrom the Indelible prep template - Create
/src/pages/pilots/<partner>/deck.astrofrom the Indelible deck template - Cross-link from GTM Phase 1A so the partner shows up where the strategy lives
- Update the partner row's
prepUrl+deckUrlhere
Where this fits
Pilots is the workshop floor. GTM is the blueprint.
The strategy lives in GTM. The build plan lives in Foundation. The user-flow audits live in Journeys. Pilots is where each named partner gets the prep + the pitch. One folder per partner. Two URLs each. No mixing.